Sign up for E-Blast


View Sample
Managed by: SMEC

Facility Review and Planning Document (July 2013- June 2014)

Summary:

Download Time : 1,080.2 KB 4 minutes 58 seconds @ 29Kbps
FRPD July 2013-June 2014.pdf

Facility Review and Planning Document (July 2012- June 2013)

Summary:

Download Time : 1,109.3 KB 5 minutes 7 seconds @ 29Kbps
FRPD July 2012-June 2013.pdf

Facility Review and Planning Document (January - June 2012)

Summary: This Facility Review and Planning Document (FRPD) is an important planning and review document at this stage of the IndII Facility’s implementation. IndII has now reached the mid-point, some three and a half years since the inception of the Facility and with three and a half years to go until its completion.Following a review of the previous workplan period, the long-term objectives for each of the program areas are defined in this FRPD, and accompanying program logic schema outlines how those objectives will be achieved between now and 2015.

Download Time : 1,836.0 KB 8 minutes 27 seconds @ 29Kbps
FRPD Jan 2012 final.pdf

Facility Review and Planning Document (February - June 2011)

Summary: This Facility Review and Planning Document (FRPD) reviews the period from August 2010 to January 2011; and presents a forward work plan for the period February 2011 until the end of the current Phase in June 2011.

Download Time : 1,469.5 KB 6 minutes 46 seconds @ 29Kbps
FRPD Feb 2011.pdf

Facility Review and Planning Document (August 2010 - January 2011)

Summary: This Facility Review and Planning Document (FRPD) reviews the period from February to July 2010 and presents a forward work plan for the period August 2010 until January 2011. Some aspects of the report also look ahead to the end of the current phase of IndII in June 2011.

Download Time : 1,309.9 KB 6 minutes 2 seconds @ 29Kbps
FRPD Aug 2010.pdf

Facility Review and Planning Document (February - July 2010)

Summary: This Facility Review and Planning Document (FRPD) reviews the period from August 2009 to January 2010 and presents a forward work plan for the period February to July 2010. The Managing Contractor seeks the Board’s endorsement of the proposed forward strategy and work plan.

Download Time : 1,189.2 KB 5 minutes 29 seconds @ 29Kbps
FRPD Feb 2010.pdf

Facility Review and Planning Document (August 2009 - January 2010)

Summary: This Facility Review and Planning Document (FRPD) reviews the period from February to July 2009. In this FRPD, IndII will also report on the substantial progress that has been made in the development of the Facility since the last report was presented in February. In particular, the significant pace of activity development and our engagement with and subsequent development of institutional relationships will be presented.

Download Time : 1,063.7 KB 4 minutes 54 seconds @ 29Kbps
FRPD Aug 2009.pdf

Facility Review and Planning Document (February - June 2009)

Summary: This document provides information for the Board of the Indonesia Infrastructure Initiative (IndII) for reviewing progress during the time since its last meeting and determining directions for the coming six months.

Download Time : 339.7 KB 1 minute 34 seconds @ 29Kbps
FRPD Feb 2009.pdf