Publications

LATEST PUBLICATIONS
AERONAUTICAL INFORMATION SERVICES/METEOROLOGICAL SERVICES FOR AIR NAVIGATION/SEARCH AND RESCUE - WORKING PAPER FOR WORKING GROUP 4

This report has been prepared by LFV Aviation Consulting, which was engaged by the AusAID funded Indonesia Infrastructure Initiative (IndII) as part of the activity to contribute to the long term development of Indonesia by assisting the Directorate General Civil Aviation to develop sound, internationally harmonised proposals for future air navigation service delivery in the form of an Air Traffic Management Master Plan.

Indonesian Airspace Sectorisation, Concept of Operations and Capacity Studies - Final Report

The Indonesian Air Traffic Management Master Plan was completed in 2011 with support from IndII. Following this, the Directorate General of Civil Aviation (DGCA) selected several projects indentified in the Master Plan as having high importance and urgency.

Air Traffic Management Master Plan for Indonesia - Final Report

This Master Plan document is expected to constitute a strategic road map for Indonesia in its development of future Air Traffic Management.

Bali Airport Development Project Deliverable 4 - Consolidated Report: Draft Final Report

This report forms a part of the Bali Airport Development project, the main report of which is Deliverable 2 on airport capacity. A Draft Final version of Deliverable 2, the main report, dated 3 January, 2011 was presented to IndII and DGCA in Jakarta on 25 January, 2011. The ensuing comments are included in Chapter 18 with the reflections of the authors.

Bali Airport Development Project: Diagnostic Report on Ngurah Rai Airport Capacity - Final Report

The overall goal of this project is stated in its terms of reference: “to identify the most appropriate future actions required to improve national and international air transportation to and from Bali”.