Publication Archives
Bus Improvement Project Phase 2 - Baseline Study Draft Report
Summary: Regarding the monitoring and evaluation in Bus Improvement Project, the Project Implementation Team (PIT) has to capture the preliminary condition on selected cities through a baseline study. To undertake this study, PIT has to capture the existing condition and gathering the preference of the community as the target user of...
1,881.2 KB 8 minutes 39 seconds @ 29KbpsDetails | Download
Bus Improvement Project Phase 2 - Bus Shelter Specification
Summary: The objective of this specification is to provide local government with functionally and technically sound reference and guidelines to design, build, and operate supporting infrastructure for Bus Rapit Transit system....
1,340.1 KB 6 minutes 10 seconds @ 29KbpsDetails | Download
