Publication Archives
Air Traffic Management Master Plan for Indonesia - Final Report
Summary: This Master Plan document is expected to constitute a strategic road map for Indonesia in its development of future Air Traffic Management....
8,947.1 KB 41 minutes 9 seconds @ 29KbpsDetails | Download
Bali Airport Development Project Deliverable 4 - Consolidated Report: Draft Final Report
Summary: This report forms a part of the Bali Airport Development project, the main report of which is Deliverable 2 on airport capacity. A Draft Final version of Deliverable 2, the main report, dated 3 January, 2011 was presented to IndII and DGCA in Jakarta on 25 January, 2011. The ensuing...
1,896.0 KB 8 minutes 44 seconds @ 29KbpsDetails | Download
Bali Airport Development Project: Diagnostic Report on Ngurah Rai Airport Capacity - Final Report
Summary: The overall goal of this project is stated in its terms of reference: “to identify the most appropriate future actions required to improve national and international air transportation to and from Bali”....
1,601.9 KB 7 minutes 22 seconds @ 29KbpsDetails | Download
Asean Open Sky Implementation Study Stage 2 - Inception Report
Summary: Stage 1 of the study was an initial review and scoping study that provided an initial assessment of the current state of the Indonesian aviation sector and the opportunities and challenges it faces from further liberalisation of air services within the ASEAN region. Stage 2 is the full study, which...
943.8 KB 4 minutes 21 seconds @ 29KbpsDetails | Download
AERONAUTICAL INFORMATION SERVICES/METEOROLOGICAL SERVICES FOR AIR NAVIGATION/SEARCH AND RESCUE - WORKING PAPER FOR WORKING GROUP 4
Summary: This report has been prepared by LFV Aviation Consulting, which was engaged by the AusAID funded Indonesia Infrastructure Initiative (IndII) as part of the activity to contribute to the long term development of Indonesia by assisting the Directorate General Civil Aviation to develop sound, internationally harmonised proposals for future air...
851.8 KB 3 minutes 55 seconds @ 29KbpsDetails | Download
COMMUNICATIONS, NAVIGATION AND SURVEILLANCE - WORKING PAPER FOR WORKING GROUP 3
Summary: This report has been prepared by LFV Aviation Consulting, who was engaged under the AusAID funded Indonesia Infrastructure Initiative (IndII) as part of the activity to contribute to the long term development of Indonesia by assisting the Directorate General Civil Aviation to develop sound, internationally harmonised proposals for future air...
1,327.8 KB 6 minutes 7 seconds @ 29KbpsDetails | Download
AIR TRAFFIC CONTROL - WORKING PAPER FOR WORKING GROUP 2
Summary: This report has been prepared by LFV Aviation Consulting, who was engaged under the AusAID funded Indonesia Infrastructure Initiative (IndII) as part of the activity to contribute to the long term development of Indonesia by assisting the Directorate General Civil Aviation to develop sound, internationally harmonised proposals for future air...
948.6 KB 4 minutes 22 seconds @ 29KbpsDetails | Download
AIR TRAFFIC FLOW MANAGEMENT/AIRSPACE MANAGEMENT - WORKING PAPER FOR WORKING GROUP 1
Summary: This report has been prepared by LFV Aviation Consulting, who was engaged under the AusAID funded Indonesia Infrastructure Initiative (IndII) as part of the activity to contribute to the long term development of Indonesia by assisting the Directorate General Civil Aviation to develop sound, internationally harmonised proposals for future air...
1,057.4 KB 4 minutes 52 seconds @ 29KbpsDetails | Download
