Sign up for E-Blast


View Sample
Managed by: SMEC

Publication Archives

Air Traffic Management Master Plan for Indonesia - Final Report

Summary: This Master Plan document is expected to constitute a strategic road map for Indonesia in its development of future Air Traffic Management....

8,947.1 KB 41 minutes 9 seconds @ 29Kbps
Details | Download

Bali Airport Development Project Deliverable 4 - Consolidated Report: Draft Final Report

Summary: This report forms a part of the Bali Airport Development project, the main report of which is Deliverable 2 on airport capacity. A Draft Final version of Deliverable 2, the main report, dated 3 January, 2011 was presented to IndII and DGCA in Jakarta on 25 January, 2011. The ensuing...

1,896.0 KB 8 minutes 44 seconds @ 29Kbps
Details | Download

Bali Airport Development Project: Diagnostic Report on Ngurah Rai Airport Capacity - Final Report

Summary: The overall goal of this project is stated in its terms of reference: “to identify the most appropriate future actions required to improve national and international air transportation to and from Bali”....

1,601.9 KB 7 minutes 22 seconds @ 29Kbps
Details | Download

Asean Open Sky Implementation Study Stage 2 - Inception Report

Summary: Stage 1 of the study was an initial review and scoping study that provided an initial assessment of the current state of the Indonesian aviation sector and the opportunities and challenges it faces from further liberalisation of air services within the ASEAN region. Stage 2 is the full study, which...

943.8 KB 4 minutes 21 seconds @ 29Kbps
Details | Download

AERONAUTICAL INFORMATION SERVICES/METEOROLOGICAL SERVICES FOR AIR NAVIGATION/SEARCH AND RESCUE - WORKING PAPER FOR WORKING GROUP 4

Summary: This report has been prepared by LFV Aviation Consulting, which was engaged by the AusAID funded Indonesia Infrastructure Initiative (IndII) as part of the activity to contribute to the long term development of Indonesia by assisting the Directorate General Civil Aviation to develop sound, internationally harmonised proposals for future air...

851.8 KB 3 minutes 55 seconds @ 29Kbps
Details | Download

COMMUNICATIONS, NAVIGATION AND SURVEILLANCE - WORKING PAPER FOR WORKING GROUP 3

Summary: This report has been prepared by LFV Aviation Consulting, who was engaged under the AusAID funded Indonesia Infrastructure Initiative (IndII) as part of the activity to contribute to the long term development of Indonesia by assisting the Directorate General Civil Aviation to develop sound, internationally harmonised proposals for future air...

1,327.8 KB 6 minutes 7 seconds @ 29Kbps
Details | Download

AIR TRAFFIC CONTROL - WORKING PAPER FOR WORKING GROUP 2

Summary: This report has been prepared by LFV Aviation Consulting, who was engaged under the AusAID funded Indonesia Infrastructure Initiative (IndII) as part of the activity to contribute to the long term development of Indonesia by assisting the Directorate General Civil Aviation to develop sound, internationally harmonised proposals for future air...

948.6 KB 4 minutes 22 seconds @ 29Kbps
Details | Download

AIR TRAFFIC FLOW MANAGEMENT/AIRSPACE MANAGEMENT - WORKING PAPER FOR WORKING GROUP 1

Summary: This report has been prepared by LFV Aviation Consulting, who was engaged under the AusAID funded Indonesia Infrastructure Initiative (IndII) as part of the activity to contribute to the long term development of Indonesia by assisting the Directorate General Civil Aviation to develop sound, internationally harmonised proposals for future air...

1,057.4 KB 4 minutes 52 seconds @ 29Kbps
Details | Download
Bookmark and Share